Heating systems ATV DIN 18380
Heating and cooling system for the new construction of a children's house in Rosenheim. Heat and cold supply is provided via a reversible outdoor air-to-water heat pump. A 1,500-liter buffer storage tank as well as a heating and cooling distributor will be installed in the technical room. The individual heating and cooling circuits are supplied via these. The heating and cooling of the rooms is carried out via underfloor heating with a total area of around 1,200 m2, distributed over the ground floor and upper floor. In addition, radiators are installed to temper the technical rooms on the upper floor. In the ventilation units...
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Heizungstechnische Anlagen ATV DIN 18380