Martino-Katharineum (Extended shell construction work) - th
- Site installation, maintain for 8 months - 6 pcs wall openings in existing wall, up to 1.40x32.5 m size, incl. concrete cutting work - 1 pc installation of lintel beam as reinforced concrete precast element, 150x20x30 cm - 35 m² sheet pile wall, drilled (pre-bored) shoring beams and square timber infill + static verification - 250 m² slope plastic sheeting covers - 1 pc set up and maintain open dewatering - 60 m³ excavate gravel base layer in foundation pit area, load directly and dispose of - 645 m² foundation pit excavation homogenous area 1 (backfill) load directly and dispose of - 20 m³ extra charge soil BM-F1 - 150 m³ extra charge
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Martino-Katharineum (Erweiterte Rohbauarbeiten) - th