Construction of a pedestrian and bicycle path along national road DK 55 on the Malbork - Sztum section
The contract includes the construction of a pedestrian and bicycle path from existing km 26+612 to existing km 34+384 of national road no. 55. As part of the task, it is planned, among other things: • construction of a pedestrian and bicycle path, • reconstruction of national road no. 55 on a section of approx. 901 m, • reconstruction of junctions along the designed pedestrian and bicycle path, • construction of cyclist rest areas (MOR), • reconstruction of a railway crossing, • construction of a technological duct, • construction of pedestrian crossing lighting, • construction of drainage within the scope of the designed pedestrian and bicycle path and reconstruction within the scope of the existing road drainage
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Budowa drogi dla pieszych i rowerów wzdłuż DK 55 na odcinku Malbork - Sztum