Construction of a high‑efficiency gas cogeneration system with a capacity of 1.202 MWt and 0.999 MWe in Ozimek
1. The subject of the contract is the execution of construction works within the project entitled “Construction of a high‑efficiency gas cogeneration system with a capacity of 1.202 MWt and 0.999 MWe in Ozimek” – gas boiler house at Plac Wolności 8 in Ozimek. 2. The task foresees the reconstruction and extension of the existing gas boiler house building at Plac Wolności 8 in Ozimek, on plot no. 81/8, district 0091 Ozimek, together with the installation of a cogeneration plant with a thermal output of at least 1.15 MWt and an electrical output of 0.999 MWe as part of adapting the existing facility and technical infrastructure to efficient requirements.
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Zabudowa układu wysokosprawnej kogeneracji gazowej o mocy 1,202 MWt i 0,999 MWe w Ozimku