F07-001-09.2 Screed work
The SB Bayern 07 association is renovating the existing Bayern 07 outdoor swimming pool at Pulversee 1 in Nuremberg. In March 2026, the demolition of the existing supervision and technical building (approx. 650 m³) and partial demolition of the two large pools began. The entrance building, changing rooms and sanitary areas remain untouched. Two new stainless steel pools were built at a new location and at a higher elevation on the site. A new technical building with a waterproof concrete basement houses all the technology for the swimming pool, a supervision area and a changing and wet area for people with disabilities. The ground floor of the building was bricked u
Translated automatically from the original language, so check the official notice for the exact wording. Original title: F07-001-09.2 Estricharbeiten