Industrial area development on 20 hectares hall infrastr
The aim of the project is to build a 1,200 m2 industrial production hall in a 20-hectare industrial area with the infrastructure necessary for the intended use of the building and meeting the technical and professional expectations of the call for proposals, as well as fencing the property concerned. As an energy efficiency measure, the project includes the use of renewable energy sources for the production hall, with an air-to-air heating and cooling heat pump to be installed to meet thermal energy requirements in accordance with the requirements of the call. As part of ICT development, a broadband internet network and high-performance wifi po
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Iparterületfejlesztés 20 hektáron csarnok infrastr