PV Zrt. no-dig reconstruction works 2026-2027
Part 1: No-dig reconstruction works in the area of the Győr Operational Engineering Directorate of Pannon-Víz Zrt. using site-cured epoxy resin-bonded liner pipes, in 5 locations with a total length of 2,692 lm (drinking water: 490 lm, wastewater: 2,202 lm): - Lining of an NA 400 steel drinking water pressure pipe in the flood area of the Holt Rábca in Győr over a length of 240 lm - Lining of the Western main pressure NA400 drinking water pipe over a length of 250 lm - Lining of an NA350 concrete sewer pipe on the section between Szent István u. Jókai u. – Benczúr u. over a length of 63 lm, lining of an