I/45 Nové Heřminovy - Zátor, 1st stage
The subject of the construction is the execution of the 1st stage of the I/45 road bypass, i.e., a 1st class road with a length of approx. 5.0 km in category S 11.5/90, which is connected at both ends to the existing I/45 road. The bypass of the I/45 road in the section between Nové Heřminovy and the municipality of Zátor is an induced investment due to the design of flood protection measures on the Horná Opava and the Nové Heřminovy Water Reservoir. Following the implementation of the water reservoir, the existing road will be interrupted and will be located in the flooded area. For this reason, it is necessary to relocate the I/45 road above the flood level of the Nové Heřminovy reservoir; the construction of the I/45 road thus addresses the relocation of the existing road I