N16.14 MP-080191 - Upn.Tavannes-Bözingenfeld - APR GC phase MP until commissioning - Phases 32 to 53 (Project author with DLT) (ID 12015)
The section extends between km 69.250 and km 76.500, including the Rochette tunnel, the Pierre Pertuis tunnel, the Côte de Chaux tunnel, the Sous les Roches tunnel, the TC of the Métairie de Nidau and the TC of La Heutte. The general objectives of the mandate are to continue the studies and the execution of maintenance and renewal of signalling installations in connection with the UPlaNS N16 Tavannes – Bözingenfeld. The services of this contract correspond to the services (SIA MP, PP 32, 41, 51, 52, 53) of project author (APR – GC Engineer) for the TP4‑TP5 sectors to its