Hall expansion of the Döhren light rail workshop - extended shell construction work
Hall expansion of the Döhren light rail workshop - extended shell construction work The shell construction work includes, after handover of the excavation pit, the production of the foundation, the underground and aboveground load-bearing structures as well as the structurally required steel construction and finishing work. The work is based on structural engineering design, the watertight concrete (WU) concept and execution planning. After the fine grading is produced, blinding concrete, foundation beams, floor slabs and all necessary earthing and built-in parts are executed as a waterproof reinforced concrete structure in accordance with the WU concept. D
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Hallenerweiterung Stadtbahnwerkstatt Döhren - erweiterte Rohbauarbeiten