Home / Construction & works / Tender
BKP 211.0 Building construction work - New construction of fire station and municipal depot building with main collection point Gubristhof, 8104 Weiningen
Buyer
Rapp AG
Country
Switzerland
Sector
Construction & works
Deadline
2027-01-25 (60 days)
Published
2026-11-24
Estimated value
Not stated
Source
TED
Service: Building construction work as main contractor, comprising site installation, testing, clearing and demolition work, utility line construction, pipe jacking, earthworks and surfacing work, sewerage and drainage, cast-in-place concrete and masonry work, precast concrete elements, steel and timber construction, ground-contact thermal insulation as well as underground water pipes and fittings.
Translated automatically from the original language, so check the official notice for the exact wording. Original title: BKP 211.0 Baumeisterarbeiten - Neubau Feuerwehr- und Werkhofgebäude mit Hauptsammelstelle Gubristhof, 8104 Weiningen
More tenders like this
AUH-SAN, Sanierung Dienstgebäude HKW Aubrugg, BKP 272.0 Innentüren aus Metall
closes 2027-01-25Elektrizitätswerk der Stadt Zürich (ewz) · Switzerland · Construction & works
RETROFIT DES CELLULES 6.4 kV DE JOULE PAR DE NOUVELLES CELLULES 24 KV SANS SF6
closes 2027-01-27SIE S.A., Service intercommunal des Energies · Switzerland · Construction & works
Alpenrhein: Steinlieferungen für Unterhalt "gesetzter" Blockwurf Winter 2027/28
closes 2027-01-27Rheinunternehmen · Switzerland · Construction & works
New construction of Biel recycling centre – concrete assembly: prefabricated concrete elements (new)
closes 2027-01-28Ville de Bienne - Département des constructions · Switzerland · Construction & works
FORUM UZH | BKP 276-01 Smoke curtains, WG16
closes 2027-01-28Kanton Zürich Hochbauaumt, Baubereich D · Switzerland · Construction & works