Current repair at the lake in “Yordan Kapsamunov” park
The following activities are planned: Repair of compromised sections – with severe cracks, collapses or structural damage; Cutting, breaking and waste removal; Filling of joint channel with concrete and breaking – removal (breaking) of old compromised fillers in deformation or construction joints, cutting and cleaning of the channels, followed by filling and restoration of the profile with specialised concrete/repair mortar; Formwork, reinforcement and concrete works – for structural restoration of walls, thresholds or specific zones; Installation of waterproofing with PVC membrane
Translated automatically from the original language, so check the official notice for the exact wording. Original title: „Текущ ремонт на езеро в парк „Йордан Капсамунов“