Home / Engineering & architecture / Tender
Preparation of project documentation – flood-damaged bridges
Buyer
Město Krnov
Country
Czechia
Sector
Engineering & architecture
Deadline
2026-12-21 (25 days)
Published
2026-11-20
Estimated value
2,000,000 CZK
Source
TED
The subject of the public contract is the preparation of project documentation for the restoration of bridge structures damaged by floods, specifically for bridge ref. no. M3-037 over the Opava River on Svatováclavská St. in Krnov, bridge ref. no. M4-037 over the Opava River on U Jatek St. in Krnov, and the footbridge ref. no. L8-038 over the Opavice River near the waterworks in Krnov.
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Zpracování projektových dokumentací – poškozené mosty po povodni
More tenders like this
Diagnostic surveys of transport infrastructure, investigative work, laboratory tests and PAU assessments according to Decree No. 283/2023 Coll. on selected roads - re-tender
closes 2026-12-21Statutární město České Budějovice · Czechia · Engineering & architecture
Cycle paths Most – Litvínov / Most – Bílina - preparation of project documentation
closes 2026-12-21Statutární město Most · Czechia · Engineering & architecture
Komplexní geotechnický monitoring a pasportizace pro stavbu „I.D pražského metra – stanice Libuš včetně dokončení tunelu (ND) – LI – stavební část“
closes 2026-12-21Dopravní podnik hl. m. Prahy, akciová společnost · Czechia · Engineering & architecture
Modernization and reconstruction of the Most – Litvínov tram line, 2nd stage, provision of technical construction supervision and other activities within the scope of construction management
closes 2026-12-22DOPRAVNÍ PODNIK měst Mostu a Litvínova, a.s. · Czechia · Engineering & architecture
PROJECT DOCUMENTATION FOR THE TOTAL REPAIR OF THE BUILDING AT KOPECKÉHO SADY 10, PLZEŇ
closes 2026-12-22Konzervatoř, Plzeň, Kopeckého sady 10 · Czechia · Engineering & architecture
Want a plain-English brief and a deadline reminder?
Pro members get a short summary of requirements and an email before this closes.
See plans