WE / GE Magdeburg-Buckau Route 6406-1 km 7,800 - 11,500
GE Track E51 km 9.875 – km 10.340 with vBE/PSS: - GE (conventional): 466 m; complete BE (conventional): 466 m - Formation improvement (conv.): 225 m - Construction of shunting paths: 897 m - Supply of track ballast GE Track 52 km 10.460 – km 11.434 with vBE/BR/PSS: - GE (assembly-line method): 689 m; BR (assembly-line method): 689 m - GE (conventional): 216 m; complete BE (conventional): 216 m - Formation improvement (conv.): 198 m - Construction of shunting paths: 1,771 m - Supply of track ballast GE Track 53 km 10.505 – km 11.197 with vBE/BR/PSS: - GE (assembly-line method): 642 m; BR (assembly-line method): 642 m - G