EUR Resilient Westhoek in Reality - Water Buffering Alveringem
The project aims primarily at the structural prevention of flooding in the village center of Leisele. By giving water controlled space in open space outside the built-up core, damage is avoided without shifting problems to other downstream locations. Location 1 - small retention basin: A controlled flood area is established in the form of a buffer basin with active level control via a sliding weir. This measure is necessary to avoid flooding near Izenbergestraat, where water during heavy rainfall from the upstream g
Translated automatically from the original language, so check the official notice for the exact wording. Original title: EUR Weerbare Westhoek in Werkelijkheid - Waterbuffering Alveringem
More tenders like this
Want a plain-English brief and a deadline reminder?
Pro members get a short summary of requirements and an email before this closes.
See plans