Main construction work
- General site installation - Earthworks for vehicle pit and foundations - 245 m of rainwater and sewage pipes - 93 m³ of reinforced concrete foundations in lost formwork - 640 m² of waterproof reinforced concrete floor slab - 77 m² of waterproof reinforced concrete basement wall - 452 m² of reinforced concrete ceiling - 1 piece of 3-flight reinforced concrete staircase ground floor to upper floor - 1 piece of 1-flight reinforced concrete staircase upper floor to attic - 10 pieces of large hall concrete columns 24/62/670 cm to 24/102/670 cm - 26.5 m³ of reinforced concrete foundation slabs for retaining walls in the outdoor area - 136 m² of reinforced concrete retaining walls in the outdoor area - 395 m² of waterproofing according to exposure class W2.2-E - Water