Roof sealing and plumbing work
New construction of the Friedberg - Ockstadt fire station Roof sealing and plumbing work Subject of the service for the new construction of the Ockstadt fire station: - Approx. 1,080 m2 vapor barriers cold self-adhesive membrane - Approx. 1,080 m2 tapered insulation avg. 230 to 240 mm - Approx. 1,080 m2 2-layer roof waterproofing made of DU cold self-adhesive polymer bitumen membrane, DO polymer welded membrane - Approx. 1,080 m2 protective layer - Approx. 1,080 m2 green roof structure made of extensive substrate thickness approx. 8 cm - Approx. 130 lin m fall protection rail system ballast-held - Approx. 92 pcs PV module mounting, ballast-held - Approx. 85 lin m attic flashing S