"Anti-filtration protection of the body locally and the substrate along the entire length on the right bank of the Wisłoka River at river km 21+300 - 27+900 in the town of Mielec"
The subject of the contract is the execution of the second part of construction works under the task entitled: "Anti-filtration protection of the body locally and the substrate along the entire length on the right bank of the Wisłoka River at river km 21+300-27+900 in the town of Mielec". The scope of the contract includes: 1. Preparatory works 2. Basic works 2.1. Earthworks. 2.2. Anti-filtration protection of the embankment substrate. 2.3. Anti-filtration protection of the embankment body. 2.4. Reconstruction of embankment culverts. 2.5. Execution of culverts on drainage ditches under the green belt. 2.6. Execution of the flood road
Translated automatically from the original language, so check the official notice for the exact wording. Original title: „Zabezpieczenie przeciwfiltracyjne korpusu lokalnie i podłoża na całej długości na prawym wale rzeki Wisłoki w km rzeki 21+300- 27+900 w msc. Mielec”