BLH, MidSommerland, Sanitary Engineering (XA-25/0007-045/TSB)
Delivery and installation of the complete sanitary engineering. This consists of the entire drinking water and waste water installation. A total of approx. 52 showers; 35 toilets, 9 urinals, 26 washbasins and 5 slop sinks will be installed. Of these, there are 4 cold showers each in the indoor and outdoor sauna area. 3 footbath floor fittings will be installed in the sauna area. Approx. 135 floor drains and approx. 60 drainage channels are required throughout the pool. Approx. 2,900 m of copper pipe DN 12- DN 80 and approx. 1,250 m of wastewater pipe made of PE and HT pipe are planned for the connections. The wastewater is fed into the sewer with approx. 11 lifting stations
Translated automatically from the original language, so check the official notice for the exact wording. Original title: BLH, MidSommerland, Sanitärtechnik (XA-25/0007-045/TSB)
More tenders like this
Want a plain-English brief and a deadline reminder?
Pro members get a short summary of requirements and an email before this closes.
See plans