Shell construction work BA2
Assembly scaffolds for shafts, safety barriers, provisional rainwater and surface water drainage, earthworks in the base area, perimeter insulation and base waterproofing with bituminous welded membranes and liquid plastic waterproofing, rehabilitation of main drainage pipes under the floor slab, slots in the floor slab, chiseling out roof drains and concreting in new roof drains, lightning protection work, walls and door openings made of sand-lime brickwork partly with reinforced concrete structural reinforcements, punching shear reinforcement in reinforced concrete M16 to M20, core drilling, chiseling subsequent openings in floor slabs and walls with the addition of L
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Rohbauarbeiten BA2
More tenders like this
Want a plain-English brief and a deadline reminder?
Pro members get a short summary of requirements and an email before this closes.
See plans