Client Support (BHU) - Chain Replacement Programme SIA 32-53
Some parts of the insulators in the Swissgrid network have reached the end of their useful life and need to be replaced. In addition, some pylons are still equipped with single chains and must be equipped with double chains. It is against this background that a nationwide chain replacement project has been launched. Initially, the preliminary project (in accordance with SIA 31) was carried out in order to obtain a complete overview of the chains to be replaced. As these results are now available, the project is moving into the design phase. In order to support the general management of