Stadtwerke Barsinghausen: New construction of the Eckerde waterworks - lot 2 civil engineering and pipe laying (LV05)
Stadtwerke Barsinghausen GmbH has decided to build a new "Eckerde waterworks". The construction site and foundations are located directly opposite the existing Eckerde drinking water treatment plant. The new waterworks is planned and to be equipped with process technology according to the state of the art. The scope of services of this tender relates to civil engineering and pipe laying work (lot 2). Installation is carried out in accordance with DIN EN 805. Width, evenness and gradient must be checked. For the installation of sewer pipes, the gradient specified in the implementation plans must be strictly adhered to
Translated automatically from the original language, so check the official notice for the exact wording. Original title: Stadtwerke Barsinghausen: Neubau des Wasserwerks Eckerde - VE 2 Tief- und Rohrleitungsbau (LV05)