Home / Construction & works / Tender
Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 3-2025. Specification No. OM25137
Country
United States
Sector
Construction & works
Deadline
2027-07-21 (236 days)
Published
2025-07-22
Estimated value
Not stated
Source
SAM.gov
Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 3-2025. Specification No. OM25137 The Contractor's dredge and attendant plant will primarily be used in connection with the construction and possible maintenance of a saltwater barrier sill located between Mile 63.0 and Mile 64.0 Above Head of Passes (AHP) on the Mississippi. The work will consist of satisfactorily placing hydraulically dredged material which shall be taken from a borrow area locat
More tenders like this
Construction Basic Ordering Agreement for Aviano Air Base
closes 2027-06-08Dept of the Air Force, Dept of Defense · United States · Construction & works
New Orleans Harbor and Various Bar Channels Cutterhead Dredge 3-2025
closes 2027-06-12Dept of the Army, Dept of Defense · United States · Construction & works
Mississippi River Outlets, Vicinity of Venice, Louisiana Tiger Pass Bar Channel, Maintenance Dredging, Plaquemines Parish, LA (ED 24-011)
closes 2027-07-16Dept of the Army, Dept of Defense · United States · Construction & works
Amendment CTX Steam Humidifier
closes 2027-07-20Department of Veterans Affairs · United States · Construction & works
Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 2-2025. Specification No. OM25136
closes 2027-07-21Dept of the Army, Dept of Defense · United States · Construction & works